PES Supply Newsroom
Technical guides, product reviews, code updates, and industry news for installers, EPCs, and project managers
Electrical Conduit Types: PVC vs. EMT vs. RMC for Solar Installations
Pick the wrong conduit for a solar job and you find out at inspection — or worse, three summers later when a UV-chalked PVC run snaps at a coupling and takes a...
Read the featured article →Latest Articles
Surge Protection for Solar Systems: SPD Sizing and Installation Guide
Surge Protection for Solar Systems: SPD Sizing and Installation Guide Type 1 vs Type 2 vs Type 3...
NEC Wire Sizing Guide: Ampacity Charts for Solar and Generator Installations
NEC Wire Sizing Guide: Ampacity Charts for Solar and Generator Installations PES PES Supply Editorial Team Trade expertise...
Conduit Fill Chart: Max THHN Conductors per EMT Size (NEC)
NEC Chapter 9 conduit fill chart — max THHN/THWN-2 conductors per EMT trade size, the 40%/31%/53% fill rules,...
Wire Ampacity Chart (NEC 310.16): Copper & Aluminum by Gauge
NEC 310.16 ampacity chart for THHN/THWN-2 copper and aluminum, 14 AWG to 4/0 — plus the 60°C/75°C termination...
Standard Breaker Sizes Chart (NEC): Breaker-to-Wire Sizing Guide
Every NEC standard breaker size in one chart — plus the 125% continuous-load rule, breaker-to-wire sizing, and a...
Solar Grounding and Bonding Guide: NEC 690.43, 250, and Lightning Protection
Last Updated: August 2026 • A Code Reference for Installers, Contractors, and Inspectors • Reading time: ~20 min...
Solar Disconnect and Overcurrent Protection Guide: NEC 690 Requirements Explained
Solar Disconnect and Overcurrent Protection Guide: NEC 690 Requirements Explained Solar Disconnect and Overcurrent Protection Guide: NEC 690...
Solar Wire and Cable Guide: PV Wire vs USE-2 vs THHN — Sizing, Selection, and NEC Compliance
Solar Wire and Cable Guide: PV Wire vs USE-2 vs THHN — Sizing, Selection, and NEC Compliance Wire...
Solar Permitting Guide: NEC Requirements, AHJ Approval Process, and Inspection Checklist
Solar Permitting Guide: NEC Requirements, AHJ Approval Process, and Inspection Checklist Reading time: ~18 min · Updated for...
NEC 2026 Effective: Top Changes Solar Installers Must Implement Now
NEC 2026 Effective: Top Changes Solar Installers Must Implement Now Reading time: ~9 min read Published January 15,...
NEC 2026 Preview: Key Code Changes Solar Installers Need to Prepare For
NEC 2026 Preview: Key Code Changes Solar Installers Need to Prepare For NEC 2026 Preview: Key Code Changes...
From Safety to Efficiency: The Role of Cantex Inc.'s Electrical Junction Boxes in Modern Infrastructure Projects
I've pulled wire through enough conduit to know that the junction box is where a job lives or...
No articles in this category on this page — try the search above or another category.